The Nature of Organization Control Assignment

The Nature of Organization Control Assignment
With the exception of depreciation, all fixed and semi-variable overheads will increase by
5% with effect from 1 January 2005.
(a) Prepare flexible budgets for monthly output levels of 55,000 and 65,000 units for
the year ended 31 December 2005.
(b) Explain the principal benefits that firms obtain from the preparation of flexible
budgets.
2. Great Lakes Co. is about to commence the final quarter of activity for the current
financial year. The results for the first three quarters of the year have been as
follows:
Questions
1. Drum Ltd. makes a single product, using a process involving stamping a circle out
from sheet steel, covering it with hide and attaching it to a sidepiece.
For 2004 the standard materials costs and requirements have been as follows: 0.4
square metres of sheet steel at £5.20 per square metre; 0.8 square metres of hide at £9.20
per square metre; sidepiece at £4.20. Price increases relating to these raw materials have
been notified for the year 2005. Sheet steel will fall in price by 10%, whilst hide will
increase in price by 10% and the sidepiece will cost £5.
It takes 30 minutes of labour to punch out the metal, cut the hide and complete the
assembly of the product. Labour currently costs the company £4 per hour, and this will
increase by 4% with effect from 1 January 2005.
Semi-variable overheads measured at different levels of output in 2004 were:
The Nature of Organization Control Assignment
(i) The variable elements of production costs are related to the volume of production.
The variable element of selling and distribution costs is related to the volume of
sales.
(ii) During the fourth quarter of the year sales volume is expected to range between
18,000 and 24,000 units; production will be set equal to sales in the quarter. The
company has been informed that the unit price of materials will increase by 8%
in the fourth quarter.
(iii) For the whole of the year the selling price is £30 per unit.
Prepare flexible budgets for the final quarter at production (and sales) levels of 18,000
and 24,000 units. Forecast the profit at these sales levels.
3. Omega PLC manufactures a product for which the standard cost data are as follows:
THE CONTROL PROCESS – 1 183
The budget for the month of April was set at an output of 5000 units and a total cost of
£235,000.
The actual output and costs for the month of April were as follows:
Actual output 4800 units
Actual costs (£)
Direct materials (14,480 kg) 73,656
Direct labour (9700 DIH) 38,800
Variable overhead 18,960
Fixed overhead 99,000
Total costs £230,416
(a) Calculate the following variances and associated subvariances for April: total
cost; Direct material; Direct labour; Variable overhead; Fixed overhead.
(b) Interpret the information provided by the fixed overhead variances in this case.
The production manager has expressed concern that the total costs seem to be running at
too high a level against budgeted costs forecast at the start of the year. You work in the
finance department, and the production manager has approached you to see if you can
analyse the causes of the problem.
(a) Calculate the budgeted standard cost of one Trimouse.
(b) Prepare a statement analysing the high level of costs that are worrying the production manager using appropriate materials, labour and overhead variances.

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more
error: Content is protected !!
Open chat
1
You can contact our live agent via WhatsApp! Via + 1 (929) 473-0077

Feel free to ask questions, clarifications, or discounts available when placing an order.

Order your essay today and save 20% with the discount code SCORE